GB Solar Case Study
Mr Kirman, Gainsborough
Project Summary
We were pleased to have completed this successful installation of a 7.6kWp PV system for our client, Mr Kirman. This system, comprised of x20 QCell solar panels, is powered by a 5.00kW GivEnergy Hybrid inverter, and also benefits from a 9.5kWh GivEnergy Battery. GivEnergy products come with 10 year warranties as standard, and customers can also opt to extend their warranty by a further 5 years should they wish. We also installed a Solar iboost, which purpose is to divert the surplus solar photovoltaic energy generated at home, to heat the water in the household tank.
GB Solar designed a suitable system, accompanied by a detailed proposal to show the renewable options for our client's home in Gainsborough. The system required prior DNO approval, and we worked with the local DNO to ensure we obtained permission before connecting, under G99 regulations. The system is estimated to generate 4,872kWh of clean energy per year, offsetting approximately 62% of Mr Kirman's home electricity consumption. With a projected payback period of around 9 years, the system is expected to provide substantial cost savings over time, while also contributing to a greener future.
Our install team completed Mr Kirman's system within 3 days, and ensured his system was fully live and operational prior to handing over. The panels were split on two roof aspects, x10 on the west facing roof and x10 on the East side, with all being protected by a bird deterrent kit. This PV System will have a self-consumption rate of 89%, whilst allowing our client to export 11% of his generated electricity to the grid.
As always, our client was provided with a full owners manual and system portal introduction upon completion. And on-going GB Solar support is always available should Mr Kirman ever require.
GB Solar designed a suitable system, accompanied by a detailed proposal to show the renewable options for our client's home in Gainsborough. The system required prior DNO approval, and we worked with the local DNO to ensure we obtained permission before connecting, under G99 regulations. The system is estimated to generate 4,872kWh of clean energy per year, offsetting approximately 62% of Mr Kirman's home electricity consumption. With a projected payback period of around 9 years, the system is expected to provide substantial cost savings over time, while also contributing to a greener future.
Our install team completed Mr Kirman's system within 3 days, and ensured his system was fully live and operational prior to handing over. The panels were split on two roof aspects, x10 on the west facing roof and x10 on the East side, with all being protected by a bird deterrent kit. This PV System will have a self-consumption rate of 89%, whilst allowing our client to export 11% of his generated electricity to the grid.
As always, our client was provided with a full owners manual and system portal introduction upon completion. And on-going GB Solar support is always available should Mr Kirman ever require.
System Installed
- x20 Q Cell Solar Panels
- GivEnergy 5.0kW Hybrid Inverter
- GivEnergy 9.5kWh Battery
- Bird deterrent kit
- Solar iboost
Estimated Cost Savings
We estimated an impressive £1,193 saving within the first year of Mr Kirman's system going live.